Checkout the following brief slideshow to get ideas and see examples of where we have made a difference for Building owners and Roofing contractors with Thermoplastic, Modified Bitumen, EPDM and Multiply Asphalt Built-Up roof membrane systems.
|
For a look at the equipment or instrumentation we utilize during a roof moisture survey click here
For an idea as to the Armco process for older roof inspection report documentation please click here
Difficult to see points of membrane breach and water entry may be located with either the Buckleys wet roof or dry roof ELD systems – click here for more detail
— R.W. – Senior Regional Field Operations Manager – National Roofing Products Manufacturer and Contractor – Read More Client Comments